Just a food for thought: Right now I’m using a rain delay on a flexible daily schedule and I get a notification every morning that schedule was skipped due to it, can this notification be reserved for days when Rachio would water, have it not been for a delay?
In other words if flexible daily schedule would not water based on information it had, there should not be a notification that a non-existing watering was skipped. I would like to see the notification be more useful than it is right now.
Thank you,
Gene