Schedule not updating correctly

I just got a notification skip on a zone this morning however the issue is the zone was not suppose to run this morning! I have Rachio D-5771C

Background:

  1. The zone was set to run every 2 days and it ran yesterday, 6/10.
  2. After it ran, I updated the duration from 2 days to 4 days and checked the calendar and it was set to run on 6/14.
  3. This morning, I got the notification that the zone was going to be skipped (6/11)
  4. The calendar now shows the next run for this zone on 6/15 and double the time.

This isn’t the only scheduling issue that I have encountered. Is there an issue if you have one controller and multiple apps installed, for example installed on an ipad (ios) and a phone (android)?

Did you update the existing schedule or did you inadvertently create a second schedule?