Run time vs Scheduled time

Water run time ran for 89 min vs the 125 minutes scheduled. Currently on a fixed schedule. Mon & Thurs.

I had the engineering team review and it looks like the schedule was manually stopped.

Screenshot%20from%202020-05-14%2009-37-52

:cheers:

It was stopped due to that zone being re-watered, when not part of the schedule.

That was due to our smart cycle technology that breaks zone runs up to avoid runoff.

This article has more information. Have a great day!

:cheers: