Daily Flex, Multi Schedules or One Schedule

I have been using flex with mixed success. I have 5 zones that have rotators, I am on well. Is it better to create 5 separate schedules or one schedule encompassing all five zones. I want to make sure that two zones do not go on at same time (well pump draw limitation) or that all zones don’t necessarily have to turn on if only one needs watering.

I use one Flex Daily schedule. It’s not possible for two zones to go on at the same time. All zones don’t turn on every day - only those zones that need watering Some days zero zones turn on.

Best regards,

Bill

As said, you can throw them all in one schedule. Rachio can’t and won’t run two zones at one time…

Smart cycle will work more effieciently with all the zones with rotators in one schedule.