Calendar to Integrate Multiple Controllers

I have 3 controllers on my property. I always strive to arrange schedules so only one station out of all of those is running at a time so as to preserve water pressure, however that takes a lot of looking back and forth to arrange. I suggest a “master schedule” feature that can integrate the schedules between several controllers to allow us to truly make one easy integrated schedule.