Reorder zones within a schedule

It appears that in a schedule, the zones will always run in zone number sequence and there is no way to reorder the zones to run in a different sequence. Is that correct? I have a Rachio 3 controller with 9 active zones. It would be nice to be able to change the sequence at times.

Go to Schedule, then Watering Durations, and you can change the sequence there.

2 Likes

Thank you!