New 2.5 app based schedules and drip zones, cycle delays

With Flex schedules, you don’t want to mix drip style zones with other zones that use popup/rotary heads. So I had setup two Flex schedules with all the drip zones in one Flex schedule and the other zones in different Flex schedule. This is done so that the Flex schedule can run multiple cycles.

With the new 2.5 based schedules, do we still have to create multiple schedules with drips and non-drips segregated?

Thanks

Yes. Drips will not allow smart cycling.

:cheers: