Show total gallons for a schedule

I have a flow rate sensor installed and my zones are calibrated. To find the total usage for a schedule, I need to click into each zone, find the gpm, and then do the math. (or wait for a run and look at usage). When making a schedule it shows the total run time. Why not do the math and show the estimated usage?

So:

  • Show total gallons while making a new schedule - handy for watering restrictions
  • Show total gallons after the schedule is made
  • Show gpm calibrated in each zone tile - saves clicking in to check