When my scheduled program attempts to run, the master valve and the first zone should be activated BUT it is raising a fault stating
“Zone Fault Detected: While running master valve or zone we detected a fault”.
However, I can stop the scheduled program run and then do a manual start of that same program and all works fine. What might be causing that initial scheduled attempt to raise a fault?