@joew - what @Gene said - only hook up the wires that are necessary. Another option if one has access to an ohm meter is to test the resistivity between the wire pair and then between each wire and the common to determine the wires actually in use. One could also check a valve box to see if more than one wire is connected to the solenoid and to confirm the common wire.
2 Likes