If a Rachio 4 were announced, what are you hoping for?

My city has a winter schedule (1 day a week) and a summer schedule (2 days a week). I have 2 schedules which are used for this. But, I have to update the start and end date every year. The two schedules don’t seem to know what the previous schedule did for water, so assumes that the soil was dry, since it doesn’t know the zone was watered with the previous schedule