Live in Denver. Before 7/5/16, seems like things were running “as needed”. The total run time was 229 minutes in 2 cycles every couple of days. On 7/5, the schedule changed to every other day with 1 cycle of 167 minutes.
Grass is green enough and I am a basic user who wants things as much on automatic as possible.
Why the change? Is this is seasonal thing?