Override field for cycle/soak durations

I’d like to see an override field available for cycle/soak in the event that we are getting runoff before Rachio’s calculated cycle/soak. At the moment, I think my only option is to increase the slope of the zone, but still it is possible that “steep slope” still yields a cycle that is too long.

Thanks, this is a good request and one I have wanted for awhile. It’s in our software backlog.

In the meantime, here is the cheat sheet for maximum run times.

Hope this helps.

:cheers: